Ivan's coupe: roof stuccowork
|
07-15-2012, 04:40 PM
Post: #356
|
|||
|
|||
Next small job is making those last few gussets for the rear and doing a proper repair to the right A-pillar where Bert made somer fucked up looking repair that is already showing rust coming from underneath.
Next and probably last big job is chopping the right rear wheelarch out, extending and fixing up the inner wheel well and welding in an escort arch. That's a 2-full-day job in my book, and one that I will be doing with a tear in my eye because there is nothing really wrong with that arch other that not being perfectly symmetrical to the other side that's already escort arched. After that it is mostly plain sailing, making reinforcements where I think they are necessary (jacking points anyone?), and some last little spots of rust. FABRICA MI DIEM, PVNC! |
|||
« Next Oldest | Next Newest »
|
Possibly Related Threads... | |||||
Thread | Author | Replies | Views | Last Post | |
Front end roof compatibility between 2dr and 3dr | Dochka | 11 | 12,101 |
01-12-2014 05:50 PM Last Post: fax0815 |
User(s) browsing this thread: 16 Guest(s)